• Inicio
  • Products
  • Projects
  • Contact

 

 

 

 

 

 

Left
  • Aquatic industry handrails and enclosed stair systems, including full stair tower options. This product used worldwide.
    Aquatic industry handrails and enclosed stair systems, including full stair tower options. This product used worldwide.
    Aquatic industry handrails and enclosed stair systems, including full stair tower options. This product used worldwide.
    Aquatic industry handrails and enclosed stair systems, including full stair tower options. This product used worldwide.
  • Various water features fabricated and installed across Canada.
    Various water features fabricated and installed across Canada.
    Various water features fabricated and installed across Canada.
    Various water features fabricated and installed across Canada.
    Various water features fabricated and installed across Canada.
  • Supply only of a remote location electrical station enclosure.
    Supply only of a remote location electrical station enclosure.
    Supply only of a remote location electrical station enclosure.
    Supply only of a remote location electrical station enclosure.
  • Supply and installation of a fiberglass pool bulkhead.
    Supply and installation of a fiberglass pool bulkhead.
    Supply and installation of a fiberglass pool bulkhead.
    Supply and installation of a fiberglass pool bulkhead.
  • Canada Games pool (New Westminster, B.C. Canada)
    Canada Games pool (New Westminster, B.C. Canada)
    Canada Games pool (New Westminster, B.C. Canada)
  • Supply and installation of a Movable Floor (A.B.F.) and two fiberglass bulkheads.
  • More to come...
    More to come...
    More to come...
    More to come...
  • Precision supplied and installed a Movable Floor (A.B.F.) and a fiberglass raising wall. Precision provided complete theming of inside the water center and supply of outside water features. Precision also supplied and installed a complete waterslide stair tower system.
    Precision supplied and installed a Movable Floor (A.B.F.) and a fiberglass raising wall. Precision provided complete theming of inside the water center and supply of outside water features. Precision also supplied and installed a complete waterslide stair tower system.
    Precision supplied and installed a Movable Floor (A.B.F.) and a fiberglass raising wall. Precision provided complete theming of inside the water center and supply of outside water features. Precision also supplied and installed a complete waterslide stair tower system.
    Precision supplied and installed a Movable Floor (A.B.F.) and a fiberglass raising wall. Precision provided complete theming of inside the water center and supply of outside water features. Precision also supplied and installed a complete waterslide stair tower system.
  • (1) Movable Floor (A.B.F.) supplied and installed fall 2007.
  • Supply and installation of one Movable Floor (A.B.F.) 6meters x 10meters.
  • Waste water treatment f.r.p. tank cover fabricated on site.
    Waste water treatment f.r.p. tank cover fabricated on site.
    Waste water treatment f.r.p. tank cover fabricated on site.
    Waste water treatment f.r.p. tank cover fabricated on site.
  • The Supply and installation of one Movable Floor (A.B.F.) and two fiberglass pool bulkheads. Also the supply and installation of complete waterslide tower complete with enclosed stairs and handrails.
    The Supply and installation of one Movable Floor (A.B.F.) and two fiberglass pool bulkheads. Also the supply and installation of complete waterslide tower complete with enclosed stairs and handrails.f.r.p. tank cover fabricated on site.
    The Supply and installation of one Movable Floor (A.B.F.) and two fiberglass pool bulkheads. Also the supply and installation of complete waterslide tower complete with enclosed stairs and handrails.
    The Supply and installation of one Movable Floor (A.B.F.) and two fiberglass pool bulkheads. Also the supply and installation of complete waterslide tower complete with enclosed stairs and handrails.
  • Precision supplied and installed commercial grating for ship loaders. Precision also custom fabricated and installed fiberglass doors. Neptune Docks.
    Precision supplied and installed commercial grating for ship loaders. Precision also custom fabricated and installed fiberglass doors. Neptune Docks.
  • Supply and installation of water intake structure for GVRD (Capilano Water Shed).
  • Complete fiberglass dock system supplied and installed.
    Complete fiberglass dock system supplied and installed.
    Complete fiberglass dock system supplied and installed.
    Complete fiberglass dock system supplied and installed.
  • Supply and installation of two fiberglass pool bulkheads..
    Supply and installation of two fiberglass pool bulkheads.
  • Waste water treatment plant Prince George. Precision supplied and installed the outer structure, fiberglass wall cladding, fiberglass grating, and customized products unique to this project.
    Waste water treatment plant Prince George. Precision supplied and installed the outer structure, fiberglass wall cladding, fiberglass grating, and customized products unique to this project.
    Waste water treatment plant Prince George. Precision supplied and installed the outer structure, fiberglass wall cladding, fiberglass grating, and customized products unique to this project.
    Waste water treatment plant Prince George. Precision supplied and installed the outer structure, fiberglass wall cladding, fiberglass grating, and customized products unique to this project.
  • Supply and installation of one self propelled fiberglass bulkhead.
    Supply and installation of one self propelled fiberglass bulkhead.
    Supply and installation of one self propelled fiberglass bulkhead.
    Supply and installation of one self propelled fiberglass bulkhead.
  • Movable Floors (A.B.F.) supplied and installed into the same YMCA Aquatic facility. One floor is 6 meters x 10 meters and the other floor is 7 meters x 20 meters.
  • Supply and installation of one Movable Floor (A.B.F.) retrofit into existing pool tank.
    Supply and installation of one Movable Floor (A.B.F.) retrofit into existing pool tank.
  • Supply and installation of one Movable Floor (A.B.F.)
    Supply and installation of one Movable Floor (A.B.F.)
    Supply and installation of one Movable Floor (A.B.F.)
    Supply and installation of one Movable Floor (A.B.F.)
  • Supply and installation of one Movable Floor (A.B.F.) and ongoing water features.
    Supply and installation of one Movable Floor (A.B.F.) and ongoing water features.
    Supply and installation of one Movable Floor (A.B.F.) and ongoing water features.
    Supply and installation of one Movable Floor (A.B.F.) and ongoing water features.
    Supply and installation of one Movable Floor (A.B.F.) and ongoing water features.
  • Supply and installation of Sea Lion pens and assorted ongoing projects.
    Supply and installation of Sea Lion pens and assorted ongoing projects.
    Supply and installation of Sea Lion pens and assorted ongoing projects.
    Supply and installation of Sea Lion pens and assorted ongoing projects.
  • Supply and installation of one Movable Floor (A.B.F.) 7meters x 20meters.
    Supply and installation of one Movable Floor (A.B.F.) 7meters x 20meters.
    Supply and installation of one Movable Floor (A.B.F.) 7meters x 20meters.
    Supply and installation of one Movable Floor (A.B.F.) 7meters x 20meters.
    Supply and installation of one Movable Floor (A.B.F.) 7meters x 20meters.
  • Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
  • Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
    Project consists of supply and installation of a waterslide tower fiberglass enclosed stair system.
  • Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
    Project consists of fabrication and installation of (1) Adjustable Buoyant Floor 18meters wide x 12.5meters long. The supply of (2) fiberglass bulkheads 18meters long x 1meter wide.
  • Project consists of two existing bulkhead retro fits and updating of existing movable floor.
    Project consists of two existing bulkhead retro fits and updating of existing movable floor.
    Project consists of two existing bulkhead retro fits and updating of existing movable floor.
    Project consists of two existing bulkhead retro fits and updating of existing movable floor.
    Project consists of two existing bulkhead retro fits and updating of existing movable floor.
Right

 

HOME       |      ABOUT      |      CONTACT                                                                           © 2009 Precision Fibre Structures
  • Acuatics
    • Benching & Shelving
    • Fiberglass Pool Bulkheads
    • Fiberglass Handrails & Stairs System
    • Lockers
    • Movable floor
    • Self propelled Fibergrass
    • Water Features
  • Communications
  • Docks
  • Industrial
  • Pultruded products
  • Marine
  • Projects Completed
  • Projects Under Construction